[]
Last edited by DCOOK87; 11-17-2014 at 06:09 PM.
The long version on how to estimate man-hours and then costing is in my book:
"Engineering Design for Manufacturability".
The short, forum post version is to break the work required down into tasks and man hours required for the tasks then assign your cost rate.