You will have to register or login (See top or bottom of page) before you can post a message or view images: click the appropriate link to proceed. To start viewing messages, select the forum that you want to visit from the selection below.
REGISTRATION Problems or questions see: Engineers Edge Forums Help & READ ME
Does an underground chilled water pipe entering a building through grade beam or a wall require any kind of pipe sleeve. If so, what should be the material of the sleeve if the pipe entering is carbon steel, Sch 40. Thanks
Forum Rules