Page 1 of 2 1 2 LastLast
Threads 1 to 20 of 40

Forum: Excel Calculators

Excel calculators, spread sheets and other manufacturing, design and engineering applications.

    • Replies: 2
    • Views: 14,090
    04-30-2023, 03:29 PM Go to last post
  1. piping dead weight calculation

    Started by ashish_shrivastava, 04-26-2019 01:05 AM
    • Replies: 1
    • Views: 11,419
    04-28-2023, 03:07 PM Go to last post
  2. Cost of Manufacturing

    Started by uddalok_biswas, 06-28-2022 06:34 AM
    manufacturing, manufacturing cost
    • Replies: 2
    • Views: 10,035
    04-01-2023, 04:38 PM Go to last post
    • Replies: 2
    • Views: 10,910
    07-14-2021, 10:32 AM Go to last post
  3. Electric Motor Starting Calculations

    Started by Kelly_Bramble, 04-15-2012 08:12 AM
    • Replies: 3
    • Views: 16,469
    06-24-2021, 07:47 AM Go to last post
    • Replies: 10
    • Views: 11,710
    05-06-2021, 03:28 AM Go to last post
  4. Engineering software

    Started by oscar_gandara, 12-12-2017 01:51 PM
    project, software, tracking
    • Replies: 2
    • Views: 14,436
    03-12-2019, 09:49 PM Go to last post
  5. UK Railway Excel Calculators

    Started by christian Bendis, 08-10-2017 02:02 PM
    • Replies: 3
    • Views: 11,255
    08-17-2018, 09:45 AM Go to last post
  6. Coefficient of friction

    Started by khisyamh, 06-07-2017 09:36 PM
    • Replies: 0
    • Views: 8,266
    06-07-2017, 09:36 PM Go to last post
  7. Home Work three phase separator calculation

    Started by cookienurozhang, 02-14-2017 02:10 AM
    three phase separator
    • Replies: 0
    • Views: 8,466
    02-14-2017, 02:10 AM Go to last post
  8. Red face ASME – Cone design calculator

    Started by joel_bogaert, 08-08-2016 09:14 AM
    • Replies: 3
    • Views: 18,341
    08-16-2016, 01:38 PM Go to last post
  9. Activated Sludge Calculations

    Started by Eng., 01-22-2016 01:15 PM
    • Replies: 3
    • Views: 13,554
    02-03-2016, 08:24 AM Go to last post
  10. PDF BOM to Excel

    Started by Fishon91, 01-01-2016 11:31 AM
    • Replies: 2
    • Views: 9,497
    01-01-2016, 11:49 AM Go to last post
  11. Electrical Panelboard Load Calculator

    Started by Kelly_Bramble, 04-15-2012 08:36 AM
    • Replies: 10
    • Views: 28,308
    12-13-2015, 02:59 PM Go to last post
  12. Structural Rectangular Spread Footing Analysis

    Started by Cragyon, 02-25-2013 03:05 PM
    • Replies: 2
    • Views: 13,894
    05-24-2015, 09:59 AM Go to last post
  13. Belt Length Calculation with Eccentric cams

    Started by GhostRider, 11-06-2014 01:11 PM
    • Replies: 1
    • Views: 7,590
    11-06-2014, 01:58 PM Go to last post
  14. Structural Beam Column Splice Calculations

    Started by Cragyon, 08-05-2014 09:07 AM
    • Replies: 0
    • Views: 9,745
    08-05-2014, 09:07 AM Go to last post
  15. Precast Pre-Tensioned Beam Design Calculator

    Started by Cragyon, 07-31-2014 12:55 PM
    • Replies: 0
    • Views: 7,228
    07-31-2014, 12:55 PM Go to last post
    • Replies: 2
    • Views: 8,718
    07-31-2014, 12:51 PM Go to last post
    • Replies: 0
    • Views: 7,807
    07-25-2014, 03:46 PM Go to last post

Forum Information and Options

Moderators of this Forum

Thread Display Options

Use this control to limit the display of threads to those newer than the specified time frame.

Allows you to choose the data by which the thread list will be sorted.

Order threads in...

Note: when sorting by date, 'descending order' will show the newest results first.

Icon Legend

Contains unread posts
Contains unread posts
Contains no unread posts
Contains no unread posts
More than 15 replies or 150 views
Hot thread with unread posts
More than 15 replies or 150 views
Hot thread with no unread posts
Closed Thread
Thread is closed
Thread Contains a Message Written By You
You have posted in this thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •