Page 1 of 2 1 2 LastLast
Threads 1 to 20 of 40

Forum: Excel Calculators

Excel calculators, spread sheets and other manufacturing, design and engineering applications.

    • Replies: 2
    • Views: 16,190
    04-30-2023, 03:29 PM Go to last post
  1. piping dead weight calculation

    Started by ashish_shrivastava, 04-26-2019 01:05 AM
    • Replies: 1
    • Views: 11,804
    04-28-2023, 03:07 PM Go to last post
  2. Cost of Manufacturing

    Started by uddalok_biswas, 06-28-2022 06:34 AM
    manufacturing, manufacturing cost
    • Replies: 2
    • Views: 10,455
    04-01-2023, 04:38 PM Go to last post
    • Replies: 2
    • Views: 11,347
    07-14-2021, 10:32 AM Go to last post
  3. Electric Motor Starting Calculations

    Started by Kelly_Bramble, 04-15-2012 08:12 AM
    • Replies: 3
    • Views: 16,885
    06-24-2021, 07:47 AM Go to last post
    • Replies: 10
    • Views: 12,205
    05-06-2021, 03:28 AM Go to last post
  4. Engineering software

    Started by oscar_gandara, 12-12-2017 01:51 PM
    project, software, tracking
    • Replies: 2
    • Views: 14,813
    03-12-2019, 09:49 PM Go to last post
  5. UK Railway Excel Calculators

    Started by christian Bendis, 08-10-2017 02:02 PM
    • Replies: 3
    • Views: 11,680
    08-17-2018, 09:45 AM Go to last post
  6. Coefficient of friction

    Started by khisyamh, 06-07-2017 09:36 PM
    • Replies: 0
    • Views: 8,613
    06-07-2017, 09:36 PM Go to last post
  7. Home Work three phase separator calculation

    Started by cookienurozhang, 02-14-2017 02:10 AM
    three phase separator
    • Replies: 0
    • Views: 8,786
    02-14-2017, 02:10 AM Go to last post
  8. Red face ASME – Cone design calculator

    Started by joel_bogaert, 08-08-2016 09:14 AM
    • Replies: 3
    • Views: 18,766
    08-16-2016, 01:38 PM Go to last post
  9. Activated Sludge Calculations

    Started by Eng., 01-22-2016 01:15 PM
    • Replies: 3
    • Views: 13,927
    02-03-2016, 08:24 AM Go to last post
  10. PDF BOM to Excel

    Started by Fishon91, 01-01-2016 11:31 AM
    • Replies: 2
    • Views: 9,838
    01-01-2016, 11:49 AM Go to last post
  11. Electrical Panelboard Load Calculator

    Started by Kelly_Bramble, 04-15-2012 08:36 AM
    • Replies: 10
    • Views: 28,893
    12-13-2015, 02:59 PM Go to last post
  12. Structural Rectangular Spread Footing Analysis

    Started by Cragyon, 02-25-2013 03:05 PM
    • Replies: 2
    • Views: 14,304
    05-24-2015, 09:59 AM Go to last post
  13. Belt Length Calculation with Eccentric cams

    Started by GhostRider, 11-06-2014 01:11 PM
    • Replies: 1
    • Views: 7,938
    11-06-2014, 01:58 PM Go to last post
  14. Structural Beam Column Splice Calculations

    Started by Cragyon, 08-05-2014 09:07 AM
    • Replies: 0
    • Views: 10,090
    08-05-2014, 09:07 AM Go to last post
  15. Precast Pre-Tensioned Beam Design Calculator

    Started by Cragyon, 07-31-2014 12:55 PM
    • Replies: 0
    • Views: 7,584
    07-31-2014, 12:55 PM Go to last post
    • Replies: 2
    • Views: 9,048
    07-31-2014, 12:51 PM Go to last post
    • Replies: 0
    • Views: 8,127
    07-25-2014, 03:46 PM Go to last post

Forum Information and Options

Moderators of this Forum

Thread Display Options

Use this control to limit the display of threads to those newer than the specified time frame.

Allows you to choose the data by which the thread list will be sorted.

Order threads in...

Note: when sorting by date, 'descending order' will show the newest results first.

Icon Legend

Contains unread posts
Contains unread posts
Contains no unread posts
Contains no unread posts
More than 15 replies or 150 views
Hot thread with unread posts
More than 15 replies or 150 views
Hot thread with no unread posts
Closed Thread
Thread is closed
Thread Contains a Message Written By You
You have posted in this thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •